Robert P. Jr. Casey

10/07/2024 | Press release | Distributed by Public on 10/07/2024 10:10

Casey, Fetterman, Reschenthaler, Deluzio, Lee Urge Army Corps to Respond to Navigation Concerns on Monongahela River, Help Mon Valley Economy

Published:
October 07, 2024

Army Corps is leading on lock and dam removal in broader effort to modernize Monongahela River, key for region's economy

Members: "We understand that the various agencies of the Commonwealth are already standing ready to support the needed work on the Mon River. The Corps must do the same, as quickly as possible"

Washington, D.C. - Today, U.S. Senators Bob Casey (D-PA) and John Fetterman (D-PA) and U.S. Representatives Guy Reschenthaler (R-PA-14), Chris Deluzio (D-PA-17), and Summer Lee (D-PA-12) continued to demand action on significant navigation issues on the Monongahela River and the ongoing impacts to the local economy. Due to significant changes in water levels, commercial barges continue to encounter shallow areas that damage equipment and impede regional commerce. The Members pressed the U.S. Army Corps of Engineers (USACE) to act swiftly to do all in its power to help alleviate the depth and navigational issues to keep the Mon-and Southwestern Pennsylvania's economy-flowing.

"We recognize that addressing shallow areas that hinder navigation is a shared priority for all stakeholders involved. Because the dam removal led to the current navigational challenges, we believe it is imperative that the Corps does everything in its power to assist in remedying the navigational issues on the Mon River," the Members wrote.

In the letter, the Members highlighted how the project will be extensive and require a multi-party effort to address and urged USACE to commit to assist in determining outstanding dredging needs with the U.S Coast Guard, the Pennsylvania Department of Transportation (PennDOT), and industry stakeholders.

The Members continued, "We understand that the various agencies of the Commonwealth are already standing ready to support the needed work on the Mon River. The Corps must do the same, as quickly as possible."

The removal of the Elizabeth Locks and Dam is part of a broader effort to modernize the Monongahela River, a key waterway for Southwestern Pennsylvania's economy. Earlier this summer, USACE began the dam removal project with help from the U.S. Coast Guard to keep the river safe and navigable during the project. Unfortunately, due to a resulting shallowness in the lock chamber, commercial barges could not initially navigate the Mon River at standard draft. The Members alerted the Corps to the ongoing issue and urged the Corps to do everything in its power to remedy the navigational challenges that continue to threaten the economy in Southwestern Pennsylvania.

Senators Casey and Fetterman and Representatives Reschenthaler, Deluzio, and Lee have consistently pressed USACE to act swiftly to restore commercial barge navigability to normal. In August, the Members raised alarms to the Corps after learning that the water levels in the Elizabeth Locks were too shallow to accommodate traditional commercial vessels. In July, the Members urged USACE to prioritize the restoration of the nine-foot draft and provide ongoing updates about the project's status. They also reminded USACE about the steep economic costs of delaying this project.

Read the letter HERE or below:

Dear Lieutenant General Graham:

We write to reiterate our ongoing concerns with the impact of the dam removal at Locks and Dam (LD) 3 on navigation traffic on the Monongahela River ("Mon River") near Elizabeth, Pennsylvania. The project's goal was to create one, continuous pool of water between Charleroi, PA and Braddock, PA, reducing travel times for commercial vessels and boosting the regional economy. While some overall reduction in water levels were expected, the drop observed after the initial demolition at Elizabeth has been unexpectedly detrimental to navigation. The resulting low water levels have created new navigational challenges on the river, that must be remedied to ensure that the benefits of the removal become a reality.

We recognize that addressing shallow areas that hinder navigation is a shared priority for all stakeholders involved. Because the dam removal led to the current navigational challenges, we believe it is imperative that the Corps does everything in its power to assist in remedying the navigational issues on the Mon River. We understand that the Corps' support for this work could include, but is not limited to:

  • Developing and sharing all relevant data, including all survey results that may be helpful to determining outstanding dredging needs with the Coast Guard, the Pennsylvania Department of Transportation (PennDOT), and industry stakeholders;
  • Exploring potential beneficial uses of dredged materials produced as a result of Corps dredging and any supplementary dredging;
  • Expediting permitting for dredge work on the Mon River;

We appreciate the Corps' ongoing work to respond as it can to the high points by using existing funding to quickly begin dredge work on problematic areas. However, the outstanding work required to return the river to its pre-demolition functionality is extensive and will require a multi-party effort to address. To facilitate that essential collaboration, we respectfully request answers to the following questions:

  • Will USACE commit to taking all action possible to return the Mon to its pre-demolition functionality, including but not limited to sharing all relevant river survey results with the Coast Guard, PennDOT, and industry stakeholders, exploring potential beneficial uses of dredged material, and expediting permitting as possible and appropriate?
  • What is USACE's plan for the remainder of the dam at the Elizabeth Locks and Dam? Will USACE and its contractors continue to detonate and remove the dam? If so, does USACE anticipate that this will have any impact on water levels?
  • How is USACE prepared to work with other permitting agencies to expedite any needed permit adjustments?

We understand that the various agencies of the Commonwealth are already standing ready to support the needed work on the Mon River. The Corps must do the same, as quickly as possible. We appreciate your prompt attention to the urgent needs on the Mon River and the questions above.

###

  • Print
  • Email
  • Share
  • Tweet