Cape May County, NJ

10/10/2024 | Press release | Distributed by Public on 10/10/2024 14:02

NOTICE OF NIGHT PAVING OPERATION- GOSHEN RD (CR 615) RESURFACING IMPROVEMENTS

CAPE MAY COURT HOUSE, NJ -- Night paving operations will commence on Thursday October 10, 2024, along Goshen Road (CR 615) encompassing the Phase 1 area that extends from Dias Creek Road (CR 612) to Railroad Avenue. The paving work will begin around 4:00pm and should be completed by midnight. Thru traffic will be detoured continuously as part of the current phase 1 detour; however, local residents and businesses will always have access to their properties.

Due to the nature of the paving operation, local residents are advised that there may be times when access to their homes will be unavailable as the paving operation proceeds along the frontage of their properties. However, immediately after the asphalt has been placed and has cooled, local traffic will be permitted to drive over the new paving to gain access to their homes. Residents should prepare for the paving operation by limiting any unnecessary trips thru the work zone Thursday night. Emergency access will always be maintained.

Residents should expect to hear some construction noise during the operation and could detect minimal vibrations during the asphalt compacting process. Upon completion of the paving operation, this section of Goshen Road will be re-opened to two-way traffic. Motorists are advised to proceed with caution upon completion of this base paving operation as the roadway centerline will not be striped but will be delineated with temporary stick down reflectors. Manhole castings will project approximately 2 inches above the base paving surface until the final surface course paving is installed under a separate paving operation.