10/09/2024 | Press release | Distributed by Public on 10/09/2024 08:50
Posted On: October 9, 2024
Volusia County has secured two Intracoastal Waterway low-rise drawbridges, Highbridge and Main Street, into the down position. Bridge operations for boat traffic are suspended until after the storm. They will resume after the bridges have been inspected and cleared for operation.
Potential bridge closures
Volusia County enacts high-rise coastal bridge closures for vehicular traffic when determined necessary by the emergency management director in coordination with the Volusia Sheriff's Office and local law enforcement under the following conditions: