City of Batavia, IL

12/11/2024 | Press release | Distributed by Public on 12/11/2024 10:35

Fox Riverbank Stabilization Project by Shumway Avenue Begins

The project includes replacing a portion of the retaining wall, extending block wall terraces, and installing a rock toe at the water level. During construction, the sidewalk and bike path adjacent to the construction area will be closed. However, an on-street bike path and an alternative sidewalk will remain open.