MoDOT - Missouri Department of Transportation

09/06/2024 | Press release | Distributed by Public on 09/06/2024 12:11

Weekend Closure Scheduled for Missouri Route 47 over U.S. Route 61 at Troy

U.S. 61 Temporarily Reduced to One Lane - Expect Delays September 20-22

HANNIBAL - Motorists on U.S. Route 61 are advised of lane closures resulting in expected delays due to the removal of the northern portion of the existing Route 47 bridge at the Troy interchange in Lincoln County. Weather permitting, Friday, September 20 beginning at 10 p.m. through Sunday, September 22 at 10 p.m., U.S. 61 will be reduced to one lane in each direction and traffic will be rerouted over the on/off ramps at the interchange. Traffic movements from U.S. 61 to MO 47 at the ramp terminals will be restricted to right turns only. In case of inclement weather, this work could be rescheduled on September 27-29.

The Missouri Route 47 bridge over U.S. Route 61 will be closed to all traffic at the interchange during this time.

During the closure, a signed detour will divert traffic on the following routes:

  • MO 47 (Eastbound/Westbound) will use a signed detour over East Cherry Street to South Lincoln Drive then northbound to MO 47 or southbound to the South Lincoln Drive interchange. Travelers wishing to access U.S. 61 from MO 47 will utilize this detour.
  • U.S. 61 (Northbound) to MO 47 (Westbound toward Hawk Point) will utilize the South Lincoln Drive interchange to reach MO 47
  • U.S. 61 (Northbound/Southbound) traffic will be diverted up and over the existing interchange ramps
  • The U.S. 61 (Northbound) on-ramp at Old Cap Au Gris Road will be closed to traffic

Once the bridge removal is complete, construction will begin on the northern half of the new bridge. During this time, Missouri Route 47 will be reduced to one lane in each direction and include a 12-foot width restriction, from North Lincoln Drive to East Cherry Street. All traffic will be shifted to the existing southside of bridge. U.S. 61 off-ramp traffic will be restricted to right turns only at the ramp terminals onto MO 47. Motorists will utilize the signed detour in reaching their destinations. Stage 2 is scheduled to be complete by December 15, 2024.

The entire area of the interchange will be an active work zone over the next year. We would like to remind drivers to please slow down, obey all signs and eliminate distractions while driving. Signs and message boards will be in place to alert motorists, as schedule changes occur. MoDOT will alert the public about the project through signs, news releases and social media. We encourage you to view the Stage 2 Constructionvideo to learn more about traffic impacts during this phase. Please visit the project website at www.modot.org/missouri-route-47-and-us-route-61-interchange-improvements-lincolnto view all project construction stage videos.

The $15.4M contract was awarded this summer to KCI Construction Company of St. Louis, MO. The project is scheduled to be completed by the Fall of 2025.

For more information on this and other projects in your area, please contact MoDOT's Customer Center toll-free at 1-888-ASK MODOT (275-6636). Work with us in the work zone! Please remember to obey all work zone signs and personnel. With an increased number of highway work zones in Missouri, we urge all drivers to pay attention every second while driving, especially through a work zone. Be informed of your route by checking the MoDOT Traveler Information Map before you travel.

Districts Involved
Northeast
Published On
Fri, 09/06/2024 - 08:07
Links to related information
Traveler Information Map