The Electricity Authority Te Mana Hiko's final determination is that Genesis Energy Limited, as the generator that owns Huntly Unit 4, was the causer of the 11 April 2024 under-frequency event (UFE).
The Authority's reasons for this final determination are:
In accordance with clause 8.65 of the Electricity Industry Participant Code, the clearing manager will rebate the event charges to the relevant participants. The event charge calculated in the system operator's report to the Authority is $205,003.75.
Any dispute of this final determination can be lodged with the Rulings Panel via [email protected] by 5pm, 17 December 2024.